When your South Florida remodel needs a permit
Replacing cabinets is different from moving a sink or opening a wall. We explain where permits enter a South Florida remodel, what inspections cover, and why your building department has the final word.

Start with what changes behind the finish
A cabinet swap and a kitchen layout change can look similar on a shopping list. They are different projects at the building department. The useful question is not simply whether you are remodeling. It is whether you are changing the building, its systems, or its exterior openings.
Replacing cabinets in the same configuration usually does not need a permit when the plumbing, wiring and walls stay untouched. A straightforward fixture replacement in the same location may also be exempt, depending on the fixture, the building and the work involved. Reconnecting a faucet is not the same scope as relocating its supply and drain lines.
Your building department has the final word. Requirements can differ across Miami-Dade, Broward and Palm Beach counties, and between municipalities within them. Confirm which department serves your property. Do not apply a neighboring city's exemption to your own address, or assume a single-family home exemption also covers your condo.
Know which changes usually need permits
Describe the actual work before asking whether a permit is required. Saying you are updating a bathroom leaves out whether the toilet stays put, the shower drain moves or a wall comes down.
- Moving plumbing: Relocating a sink, shower or toilet changes more than the visible fixture. Supply, drain and vent work generally needs permitting.
- Adding circuits: New circuits and changes to electrical wiring generally require an electrical permit, even when the room layout stays the same.
- Changing walls: Removing, adding or altering walls generally needs review. Do not assume a wall is nonstructural because it sounds hollow.
- Replacing a roof: A roof replacement generally requires a permit and inspections appropriate to the approved roofing work.
- Replacing windows or exterior doors: These replacements generally need permits, even when the openings stay the same size. A simple interior door replacement may be treated differently.
In a South Florida house with a concrete slab, moving a drain may mean opening the slab. In a block wall, enlarging an opening raises different questions from replacing an interior door slab. Tell the department about those details before demolition begins.
Settle the scope before preparing drawings
Decide what stays and what moves before the permit application is prepared. Mark the existing and proposed sink, appliances, walls and openings. Otherwise, a late layout decision can mean revised drawings and another review before the affected work proceeds.
Structural changes, such as removing a load-bearing wall, adding a beam or building an addition, need drawings signed and sealed by a Florida-licensed engineer or architect before the building department issues a permit. A sketch showing an open kitchen does not establish how the structure above it is supported.
We prepare measured floor plans, engineering and permit drawings as part of our construction design work. The documents need to describe the work being proposed, including the systems affected, rather than only the finished appearance.
For a condo, ask your association about its approval process as well. Association approval and a building permit serve different purposes. Ask about access to shared plumbing, work affecting common elements and any documents needed before construction. Neither approval should be treated as a substitute for the other.

Put permit responsibility in the written scope
Before work starts, establish who prepares the application, submits drawings, answers review comments, requests inspections and follows through to closure. Those responsibilities belong in the project scope, not in an informal assumption that someone else is handling them.
We are PSR Home Remodeling, a licensed and insured remodeling contractor based in Miami, working across Miami-Dade, Broward and Palm Beach counties. We pull the permits, answer the plan reviewer, meet every inspector and close the permit.
Ask to see the issued permit and the approved scope before permit-required work begins. An application receipt means the paperwork was submitted. It does not mean the department has authorized construction. If the scope changes after approval, we check what revisions or additional permits the department requires before proceeding with that change.
Keep the approved drawings accessible during construction. They give you, the contractor and the inspector a shared reference when a question arises about a wall, an opening or a plumbing location.
Leave work visible for the required inspections
Inspections happen at stages when the relevant work can still be examined. Depending on the permit, an inspector may need to see plumbing before the slab is patched or wiring before a wall is closed. Covering that work early can mean uncovering it for inspection.
The checks depend on the approved scope. Plumbing inspections may cover piping, connections and required tests. Electrical inspections may cover wiring, circuits and protective devices. Structural inspections may check reinforcement, connections and framing against approved drawings. Roof and exterior opening inspections address the applicable installation details.
Here, stucco can conceal an opening's attachments, and tile can conceal plumbing work. Summer downpours also matter when planning how to protect an exposed roof or exterior opening while inspections are coordinated. Inspection access and temporary protection need to be considered together.
For a kitchen project, our article on the order a kitchen remodel actually happens in explains the broader construction sequence. The permitting point is simple: required inspections belong in that sequence before the relevant work is covered.
Keep the closure record for a future sale
Unpermitted work can surface when a buyer compares the home with available plans and permit records. A changed layout, replaced roof or added bathroom may prompt questions about what was approved and inspected. An issued permit that remains open can also require follow-up.
Keep the approved plans, inspection results and permit closure confirmation together. A finished-looking room does not establish that its permit is closed. Ask for confirmation from the building department rather than relying only on the last construction visit.
If you discover older work without clear records, start with the department's permit history. Ask what documentation or inspections it needs to evaluate the situation. Avoid assuming that a new remodeling permit automatically resolves unrelated past work.